Ground Mounting System Concrete Base

Ground Mounting System Concrete Base

Material: Aluminum 6005-T5 & HDG or ZAM Steel
Max Wind Load: According to the projects request
Max Snow Load: According to the projects request
Solar Module Orientation: Portrait or Landscape
Application:Ground or Farm
Pre-assembled parts at the factory, fast and easy to install
OEM & Sample: Available
Send Inquiry
Description
 

A ground mounting system concrete base is a crucial part of solar panel ground mounting systems and other ground-based installations. Here is an introduction to it:

 

Function:

 

Load Bearing:It bears the weight of the ground mounting system and solar panels, as well as external forces like wind and snow. It ensures the stability and safety of the entire system, preventing the solar panels from being damaged or even collapsing due to insufficient support.

Fixing and Positioning:Accurately fixes the position of the ground mounting system, ensuring that the solar panels are installed at the designed angle and orientation. This is important for optimizing the capture of solar energy and improving the power generation efficiency of the solar panels.

Isolation and Protection:Isolates the ground mounting system and solar panels from the ground, preventing moisture, chemicals in the soil and other factors from corroding the components of the mounting system. This helps to prolong the service life of the system.

 

Construction Process

 

Foundation Preparation

Site Cleaning:Clear the construction site of debris, vegetation and other foreign matters, and level the ground to create a flat and stable construction surface.

Measurement and Marking:According to the design requirements, use measuring tools to accurately measure and mark the position and size of the concrete base to ensure accurate construction.

Formwork Installation

Formwork Selection:Choose formwork materials that are strong, durable and easy to install, such as wooden formwork or steel formwork.

Installation and Fixing:Install the formwork according to the marked position and ensure its firmness and tightness to prevent concrete leakage during pouring.

Reinforcement Placement

Reinforcement Selection:Select steel bars of appropriate specifications and quantities according to the design requirements to improve the strength and crack resistance of the concrete base.

Binding and Fixing:Bind the steel bars into a steel bar framework and fix them in the formwork to ensure the correct position and spacing of the steel bars.

 

Concrete Pouring

Concrete Mixing:Accurately weigh and mix cement, sand, gravel, water and other materials according to the designed mix ratio to ensure the uniformity and workability of the concrete.

Pouring Operation:Pour the concrete into the formwork evenly and continuously. Use vibration equipment to vibrate the concrete in a timely manner during the pouring process to remove air bubbles and ensure the density and compactness of the concrete.

Surface Finishing and Curing

Surface Finishing:After the concrete is poured, use tools such as a trowel to level and smooth the surface of the concrete to meet the design requirements for flatness.

Curing:Cover the concrete surface with a curing material in a timely manner and keep it moist to prevent cracks caused by rapid water loss. The curing time is usually 7 to 14 days.


 

More details please contact vivi at vivian@longsungreen.com

 

 

Technical overview;

solar mounts technical details

Installation overview:

 

solar mount component

ground mount concrete base

 

ground mount concrete base

 

Project examples:

product-467-442solar mount concrete base project reference

 

factory loading:

ground mount concrete base

solar mount factory loading

 